How long does a custom construction project take?
The project duration depends heavily on the size, complexity and equipment of the stand. Roughly estimated: Smaller projects (up to 100 m²) take 8-12 weeks, medium projects (100-300 m²) 12-16 weeks, and large flagship projects (over 300 m²) can take 16-24 weeks. These times include planning, construction and building. With our experienced team we optimize processes to reach the result as quickly as possible.