Stand construction on site

Exhibition Stand Hamburg – Your Stand Builder for Hamburg Messe

Exhibition stand builder for Hamburg Messe: EXFAIR® designs and builds stands for SMM, WindEnergy Hamburg, INTERNORGA and Aircraft Interiors Expo – for exhibitors from Germany and abroad.

We usually respond within 24 hours

Exhibition stand construction since 1987, own workshop in Villingen-Schwenningen

Concept, 3D visualisation, assembly and dismantling from one source

Short notice? EXPRESS exhibition stand

Typical trade fairs

SMM, WindEnergy Hamburg, INTERNORGA, Aircraft Interiors Expo, CSI Design Expo Europe

Exhibition centre

87,000 sqm in eleven halls, 10,000 sqm outdoor space, central city location

1

Send your enquiry

Tell us the fair, date and stand size – via the form or by phone.

2

Concept and quote

You receive a design with 3D visualisation and a transparent quote.

3

Assembly on site

EXFAIR builds your stand on schedule and dismantles it after the fair.

In brief

The Hamburg Messe und Congress exhibition grounds are located in the city centre and, according to the operator, offer 87,000 sqm in eleven halls plus 10,000 sqm of outdoor space. EXFAIR designs and builds exhibition stands for exhibitors at SMM, WindEnergy Hamburg, INTERNORGA and Aircraft Interiors Expo.

Hamburg Messe at a glance

The leading fairs in Hamburg include SMM (maritime industry, every two years), WindEnergy Hamburg (onshore and offshore wind, every two years), INTERNORGA (hospitality and foodservice, annual) and Aircraft Interiors Expo (aircraft cabins and passenger experience, annually in April). Since 2025, CSI Design Expo Europe for cruise ship interiors has also been held in Hamburg.

What to know about stand building in Hamburg

Under the Technical Guidelines of Hamburg Messe und Congress, stands with a build height of 4.0 m or more require approval; in halls B1 to B4 along the hall walls, this applies from 3.40 m. Multi-storey stands, walk-on platforms above 50 cm and outdoor stands also require approval; documents must be submitted eight weeks before the event. Loads may only be suspended from the hall ceiling by the venue's rigging partner.

Last updated: October 2026. Prices and lead times are guide values; the written quote is binding.

Your exhibition stand builder for Hamburg Messe – planning, production in our own workshop, logistics, assembly and dismantling from a single source.

Services from a single source

EXFAIR develops system stands and custom builds for the trade fairs in Hamburg: concept and 3D visualisation, production in Villingen-Schwenningen, transport, assembly and dismantling and storage for the next event. We coordinate stand construction approval, rigging orders and utility connections with the venue.

For exhibitors from abroad

SMM, WindEnergy Hamburg and Aircraft Interiors Expo are highly international. EXFAIR handles the complete on-site stand construction for international exhibitors, with project management in English and German.

Arriving from abroad: From Hamburg Airport (HAM) take S1 and change once – for example at the main station to S2/S5 to Dammtor (Messe/CCH) or at Jungfernstieg to U2 to Messehallen – in about 30 minutes; by taxi about 20 minutes.

For companies from these countries we have dedicated guides covering entry, customs, power, tax and timeline:

Venue information

The exhibition centre at a glance

Getting there & location

Messeplatz 1, 20357 Hamburg. U2 to Messehallen, S2/S5 and U3 to Sternschanze, S2/S5 to Dammtor (Messe/CCH), U1 to Stephansplatz. From Hamburg Airport by S1 with one change in about 30 min, taxi about 20 min. A1 and A7 motorways nearby.

EXFAIR experience at this venue

EXFAIR has been building exhibition stands at leading German trade fairs since 1987 and delivers stands at Hamburg Messe with planning, production in its own workshop, logistics, assembly and dismantling from a single source.

Exhibiting here?

Tell us the fair and date – we plan your exhibition stand and take care of assembly, dismantling and storage.

Trade fair dates

Upcoming trade fairs

Planning for one of these fairs? Request your exhibition stand directly – the earlier, the more design freedom.

Für diesen Messeplatz sind aktuell keine Messetermine hinterlegt.

FAQ

Frequently asked questions

Your question is not listed? Call us or send us your enquiry.

Does EXFAIR also build exhibition stands at Hamburg Messe?

Yes. EXFAIR designs and builds stands for exhibitors at SMM, WindEnergy Hamburg, INTERNORGA, Aircraft Interiors Expo and other trade fairs in Hamburg – from system stands to custom builds, including logistics, assembly and dismantling.

Which major trade fairs take place at Hamburg Messe?

The leading fairs include SMM (maritime industry, every two years), WindEnergy Hamburg (wind energy, every two years), INTERNORGA (hospitality, annual) and Aircraft Interiors Expo (aircraft cabins, annual).

How large is Hamburg Messe and how do I get there?

According to Hamburg Messe und Congress, 87,000 sqm in eleven halls plus 10,000 sqm of outdoor space, centrally located in the city. U2 to Messehallen, S-Bahn to Sternschanze or Dammtor; from the airport by S1 with one change in about 30 minutes.

Do I need stand construction approval for my stand in Hamburg?

Approval is required for stands with a build height of 4.0 m or more – in halls B1 to B4 along the walls from 3.40 m – as well as multi-storey stands and platforms above 50 cm. Submission eight weeks before the event. EXFAIR prepares the documents; the current Technical Guidelines of Hamburg Messe und Congress are authoritative.

How early should I commission a stand for Hamburg?

Allow approx. 4 to 8 weeks for a system stand and 8 to 24 weeks for a custom build, depending on scope. As stands requiring approval must be submitted eight weeks before the fair, the design of a custom build should be fixed correspondingly earlier.

Your stand at this venue – request a non-binding quote

Personal advice, we usually respond within 24 hours.

CONTACT
Your project, our expertise:
We look forward to your message or call.